From the architect. The universes we attend in childhood tend to linger in our memories. It’s the time when we interact with architecture in a more free and genuine way. It is when we settle appropriations and intuitively hierarchize values of architecture. We are interested in identifying the assets that are esteemed by all, and design the memories that will be formed.
In a not conformed territory a squared perimeter is set: autonomous and clear. The need for different functions in school is the pretext for establishing distinct spaces. Each compartment is a separate experience in terms of scale, proportion and identity. The aggregation of all volumes defines its external iconographic value. Inside, a protected interstitial space is defined, infinite by not disclosing its beginning or end, and used as a recreational venue.
A replicable opening, suited for all purposes is chosen, and a wall and ceiling finishing is defined for all spaces. The judicious economy of these elements brings out the diversity of spaces.
Ashland Modern is a residential project completed by Disc Interiors. The home is located in Santa Monica, California, USA. Photos courtesy of Disc Interiors
The Marseilles Docks as a place of reflexion and meeting between territory and city, past and future, users and inhabitants of the place. The Marseilles Docks as a place of architecture which is an answer to a specific context: an intervention on sensitivity and place specificity, Marseilles in relation to the Docks, the city and the sea. An intervention on the Docks ground level to create an opened system connected to penetration, transparencies and new relations extending to the sea. An intervention on people flow to give different intensities to the place.
We have been particularly attentive to how things are perceived, visual apertures, pathways and other features: light to create original atmospheres, the sun and wind as architectural/energy devices.
Reveal the beauty of a place so that it can be shared.
Reveal the beauty of a place so that it can be shared. The redevelopment of Marseilles docks will re-establish bonds between the site and city, users and local inhabitants. The architecture is a carefully targeted response to a very specific setting: the project weaves relations between the docks, city and seaside; the site of the old structure will become an open system extending to the sea through penetrations, transparencies and new relations; the arrangement of the internal courtyards is designed in relation to the various flows and their intensity with respect to the various locations. We have been particularly attentive to how things are perceived, visual apertures, pathways and other features: light to create original atmospheres, the sun and wind as architectural/energy devices.
Project Management And Implementation: buildCollective NPO
Structural Engineers: Dr. Lüchinger und Meyer Bauingenieure AG
Consultants: Rudi Keudel-Schaffer, Bruce Plumbly, Wolfgang Steiner, Nonhle Mbuthuma, Felicity Swanepoel
Main Sponsors: Friedrich Bauer, Gunter Weisbrod, Birgit Werner, Bank Austria, Pfeifer Seil und Hebetechnik, GEA,Teufelberger, ATE, Haslinger Stahlbau, HSG, Nuquip, Land Kärnten, Land Salzburg, Land Niederösterreich,
Supporters: Mbizana Local Municipality, Eastern Cape Department of Economic Development, UNESCO
From the architect. The community driven project ´bridgingMzamba` originated in the urgent need of and request by surrounding inhabitants for a safe crossing of the Mzamba River and included design and implementation of a 140 Meter long suspension bridge in a collaborative manner.
As Nonhle Mbuthuma, chairperson of the Community Committee points out: “Our community is used to not getting anything from government but in contrast to other places we are not burning cars or riot. We rather reach out and try to find new ways because we know government is not able to provide service for all. We can meet them half way to provide infrastructure.”
The Austria based NPO build Collective teamed up with two thesis students of the Carinthia University of Applied Science for the design and planning phase.
Detail
A Steering Committee representing the local community and client guided the process and carried on negotiations with necessary entities. The driving force of tribal authority, ward committee and local stakeholders ensured a successful public participation and sustainable development.
Further support and authorisation could be established in liaison with engineers from South Africa and Switzerland (Dr. Lüchinger+Meyer), environmental experts, the Mbizana Municipality and Eastern Cape Department of Economic Development Environmental Affairs and Tourism to ensure technical accuracy and compliance.
Through this collective approach with users, students and experts the production of knowledge, cultural exchange, skills development and responsibility is achieved for all participants.
The design process had been very much guided by the information, data and meetings sourced on site and outcome sent to Austria.
Schema
The general geometry of the bridge was developed at the CUAS in collaboration with engineers from Dr. Lüchinger+Meyer for the top structure and adopted in action with new findings on site.
Walkway Diagram
Main parameters were the reduction of material, a hardly accessible construction site, self-building process with community members, low maintenance, adaption with the natural landscape and of course span-width and forces of wind and usability.
Foundations were calculated according to necessary force of connections and the diverse ground conditions of rock, swamp and sandy earth. In 3D Models geometry was developed, presented to the local community and adapted.
Calculations
Continuous feedback from user, engineers and the construction process itself guided the design with fine-tuning of details until completion.
Span-width between Pylons is 66 meters with the southern Pylon of 15 meters grounded on pile foundation on the river bank and the northern pylon with 13,2 meter is grounded on a rock. 174 hangers connect the 133,85 meter carrying ropes with the two 131,9 meter guy ropes. The hangers are connected to 87 binders which carry 96 walkway-elements between a concrete bridgehead and a steel bridgehead.
Overall project costs of 200 000 Euros have been carried solely by sponsors, donations and personal contribution. In several phases of negotiations, fundraising, design and construction since 2012, this extraordinary infrastructure could be realized with October 2015 as a self-build project of community members and volunteers.
The Mzamba Bridge is now connecting residents of a catchment area of 30km to necessary infrastructure such as educational facilities, health care, jobs and general food supply. Further it serves as a landmark and potential tourist attraction in the area to enable socio-economic development.
US studio Go Logic has completed a three-bedroom home in New England, featuring angled roofs, a covered walkway and glazing that offers expansive views of the surrounding woodland (+ slideshow). (more…)
From the architect. ThomsonAdsett has designed a new Engineering Building for Charles Sturt University, with views of Bathurst’s iconic Mount Panorama race circuit.
The building accommodates the regional university’s unique new degree, which is designed to leave students equipped with both engineering and business skills. ThomsonAdsett’s design meets both needs, by providing a pitching space for business activity and maker studio, which embraces the ‘Maker Movement’ – a trend where discarded or broken goods are reimagined and marketed.
The building’s spatial diversity supports entrepreneurial thinking and the development of high-calibre engineers for employers. ThomsonAdsett developed a ‘Honeycomb of Learning’ – a spatial planning strategy which adds cohesion to the entire building. These clustered collaboration zones express the co-curricular and collaborative nature of the new learning cohort.
Plan 1
The existing facility has been transformed with a gallery, technological wall, Honeycomb of Learning, maker studio, pitch space and labs, which encourage experimentation, partnerships and enterprise. These spaces enable students to develop necessary skills and relationships, before undertaking the field study component of the innovative course.
ThomsonAdsett has created a character and sense of home for this new community, by using materials akin with regional farm and shed buildings. The form and re-use of the existing frames symbolises home, complements the rural shed aesthetic and maximises the use of embodied energy. This unique project illustrates the benefits of designing a curriculum and associated learning environment in parallel. Students and staff are already loving their new engineering home.
Green Building: Deutsche Gesellschaft für Nachhaltiges Bauen e.V. DGNB silver
Client: Schwarz-Schütte Foundation, Düsseldorf
Team Ingenhoven Architects: Christoph Ingenhoven, Martin Reuter, Peter Jan van Ouwerkerk, Roland Grube, Darko Cvetuljski, Dieter Henze, Anke Koch, Marco Lachmann, Volker Ritter, Ulrike Schmälter, Peter Georg Vahlhaus
Structural Engineering: Werner Sobek Ingenieure GmbH, Stuttgart
Facade Consultant: Werner Sobek Ingenieure GmbH, Stuttgart
Landscape Architecture: Ingenhoven architects, Düsseldorf with WKM Weber Klein Maas Landschaftsarchitekten, Meerbusch
The campus of Heinrich-Heine-University, Düsseldorf consists mostly of four- to six-storey concrete buildings, which had been built in the 1970s. The new “Oeconomicum – School of Economics”, centrally located between the university library and the medical school, next to the central pedestrian mall, marked the beginning of a general overhaul of the campus including renovation works and new constructions. It has become the new landmark of the campus.
The Oeconomicum frames one side of the Library Square and with one of its short elevations completes the Plaza. The three-storey building, which was raised on stilts, was built above the entry to an existing parking garage and as such did not require additional land use and provides sheltered bicycle stands as well as end of trip facilities.
Plan
The gently curved shape was informed by the existing lake next to the site that is used for the university cooling system. The lake, which had previously been inaccessible, is now nicely framed by a timber terrace deck that allows for outside working and studying. The terrace has become an intensively used meeting place for the entire campus.
The building itself has been designed to promote academic exchange and communication. Thus it is an expression of a new understanding of research and education.
Plan
The façades are the result of thermal considerations: open towards the south and more closed in the north. The layout of the offices allows for flexible work and meeting spots. The rooms are designed to create spaces for scientists and students that allow for cooperation as well as contemplation. Single and enclosed team offices have been located in the north with glass partitions towards the open plan areas in the middle – an office layout that enhances communication and also ensures free access to daylight and the panoramic view. The atrium along the south façade connects the common areas and ground floor classrooms with the offices of the particular chairs on the upper floors.
Maintenance costs as well as the energy consumption of the building are reduced to a minimum. The compact building exceeds the current energy saving standards by the use of geothermal energy, rain water harvesting and natural ventilation. Materials have been selected with regard to recycling, embedded energy and durability ensuring a robust and responsible building that will serve generations of students.
Pier 55, the floating park designed by Heatherwick Studio and landscape architecture firm, Signe Nielsen, received a green-light from the New York Supreme Court this past Friday, April 8, according to a report bythe Architect’s Newspaper. Floating above the Hudson River on the Lower West Side of Manhattan, the park is anchored by an aggregation of enormous petal-like stilts that are submerged in the water below. The park is being funded by the philanthropy of Diane von Furstenberg and her husband Barry Diller.
Pier 55’s legal troubles began last spring when the non-profit, City Club of New York filed a lawsuit against Pier55 Inc. and Hudson River Park Trust (HRPT) to stop the project.
The City Club voiced concerns over effects on the river’s ecosystem, specifically, “[that] the project would require driving about 550 piles in an area of the Hudson protected as an estuarine sanctuary.” The park faced another legal hurdle last November when the EPA first raised and later rescinded claims about the project’s unacceptable effects on an important aquatic resource. However, after the recent ruling by the New York Supreme Court, the project has moved beyond legal challenges, clearing the way for a planned opening in 2019.
Three houses built in the early twentieth century share a plot in a heterogeneous neighborhood of Buenos Aires.
Courtesy of Adamo faiden
Diagram
Courtesy of Adamo faiden
The upper house of the set presents the possibility of being extended, finding above itself the space to house programs related to leisure activities in contact with the air, the sun, and the sky.
Courtesy of Adamo faiden
An accumulation of existing flat roofs at different heights becomes the floor for the new construction, distributing a series of indoor and outdoor areas that are connected together. An envelope conformed by opaque, transparent and permeable elements covers the old house in all its extension, opening new possibilities of relationship with the environment.