Plan Ahead for Holiday Sales Success

Retailers: Consumers start their holiday shopping earlier than they used to. Here’s what you need to do now to plan for retail holiday success.

http://ift.tt/2eqKcHw

Get the Best Price for Heating Oil this Winter

High heating costs are a drag on everyone’s budget. Use these tips to keep the high cost of heating oil down this winter.

http://ift.tt/2dvJOaP

6 Tips for Managing Your Company’s Online Reputation

What are people saying about your business online? What should you do if you find out someone has posted a bad review? Use these 6 tips for managing your online reputation.

http://ift.tt/2eqKKxf

Why Online Reviews Are Important for Your Business

Here’s what you can do to be sure your business gets the good reviews it deserves and tips for handling negative reviews.

http://ift.tt/2dw9Cxq

New Overtime Rules

Many small businesses that never had to worry about nonexempt employees now will. Here’s what you need to know about the new overtime exemption rules.

http://ift.tt/2eqKcr0

AIRBUS Spain Central Offices / Pablo Notari Oviedo + SUMAR + CONURMA


© Eduardo Sánchez

© Eduardo Sánchez


© Eduardo Sánchez


© Eduardo Sánchez


© Eduardo Sánchez


© Eduardo Sánchez

  • Chief Architect: Steffen Ringler
  • Project Team: Begoña Vives Vinent, Judith Krassnig, Amelia Mateos Yagüe, Augusto Signorio MacroDraftsman: José Luis Paredes Conde Bill of Quantities: Manuel Sevilla Seoane, Yolanda García Portillo Systems engineer: David Torremocha Mesto Structure engineer: Infotaller de Estructuras S.L.
  • Draftsman: José Luis Paredes Conde
  • Bill Of Quantities: Manuel Sevilla Seoane, Yolanda García Portillo
  • Systems Engineer: David Torremocha Mesto
  • Structure Engineer: Infotaller de Estructuras S.L
  • Works Supervision Team: Pablo Notari Oviedo (Architect), Steffen Ringler, David Torremocha Mesto (Collaborators), Manuel Sevilla Seoane (Assistant)

© Eduardo Sánchez

© Eduardo Sánchez

From the architect. This project was born as result of the restricted competition launched in April, 2002 by AIRBUS Spain S.L. The works began in February 2003, ending in July of 2004.


© Eduardo Sánchez

© Eduardo Sánchez

The building is located at the entrance of the Airbus factory in Getafe´s municipality, forming its access door.


Ground Floor

Ground Floor

The spatial solution of three blocks supported on a stone podium linked to the topography, is the fundamental element of its expression, creating a central courtyard where the main entrance is located.


© Eduardo Sánchez

© Eduardo Sánchez

This access space is designed as a large Atrium surrounded by the glazed wings of the offices, and covered by a large canopy. The wings are connected with the rear longitudinal block by two vertical circulation cores, where also the spaces of relationship and service of each plant are located. In the rear block the closed offices are located, and the open offices are on the glazed wings.


© Eduardo Sánchez

© Eduardo Sánchez

Type Floor

Type Floor

© Eduardo Sánchez

© Eduardo Sánchez

In the access floor two patios as guiding spaces of the building are arranged, dynamic spaces both by the horizontal circulations created around them, as by the different intensities and reflections of natural light that they produce.


© Eduardo Sánchez

© Eduardo Sánchez

This Project, highly energy efficient and sustainable, expresses the commitment of AIRBUS with the environment.


© Eduardo Sánchez

© Eduardo Sánchez

The North longitudinal block has a metal panels façade, similar to the industrial buildings of the factory. But to the South it has a double façade composed by a skin of glass, and a second façade of horizontal metal louvers for light sun control.


Detail

Detail

Detail

Detail

The lateral wings also have double façades, in this case double glass façades with an intermediate space. These double façades are intended to prevent the greenhouse effect, which is difficult to control using louvers in the East and West orientations. This double façade forces up the hot air circulation in the inside, eliminating it quickly in summer, and allowing its reuse in winter by injecting the hot air in the air conditioning system.


© Eduardo Sánchez

© Eduardo Sánchez

The energy-efficient system is completed with a ventilated double cover formed by metal louvers that meet three functions: the protection of the air conditioning machinery, the solar light passive control optimizing the circulation of air, and the support of the photovoltaic panels.


© Eduardo Sánchez

© Eduardo Sánchez

http://ift.tt/2dHkrQc

Futuristic digital billboard to be erected in Hollywood

Belltower digital billboard by Tom Wiscombe

A design for “the most Instagrammable billboard in the world” by a Los Angeles team has beaten schemes by Zaha Hadid Architects and Gensler in a competition to create an advertising structure for Sunset Boulevard. Read more

http://ift.tt/2eeBxG8

How to Avoid Online Shopping Pitfalls this Holiday Season

Shopping online is a convenient way to buy holiday gifts and other things. Get the best prices and protect against online shopping problems and fraud with these tips.

http://ift.tt/2e5PJ64

The Secret Formula for Attracting Customers

Businesses that are thriving and growing have a steady flow of repeat and referred customers. Learn their secret for attracting clients here.

http://ift.tt/2eC4l9y