Retailers: Consumers start their holiday shopping earlier than they used to. Here’s what you need to do now to plan for retail holiday success.
Month: October 2016
Get the Best Price for Heating Oil this Winter
High heating costs are a drag on everyone’s budget. Use these tips to keep the high cost of heating oil down this winter.
6 Tips for Managing Your Company’s Online Reputation
What are people saying about your business online? What should you do if you find out someone has posted a bad review? Use these 6 tips for managing your online reputation.
Why Online Reviews Are Important for Your Business
Here’s what you can do to be sure your business gets the good reviews it deserves and tips for handling negative reviews.
New Overtime Rules
Many small businesses that never had to worry about nonexempt employees now will. Here’s what you need to know about the new overtime exemption rules.
AIRBUS Spain Central Offices / Pablo Notari Oviedo + SUMAR + CONURMA
© Eduardo Sánchez
- Architects: Pablo Notari Oviedo, SUMAR urbanismo y arquitectura , CONURMA Ingenieros Consultores
- Location: Paseo John Lennon, Getafe, Madrid, Spain
- Area: 28076.0 sqm
- Project Year: 2004
- Photographs: Eduardo Sánchez
- Chief Architect: Steffen Ringler
- Project Team: Begoña Vives Vinent, Judith Krassnig, Amelia Mateos Yagüe, Augusto Signorio MacroDraftsman: José Luis Paredes Conde Bill of Quantities: Manuel Sevilla Seoane, Yolanda García Portillo Systems engineer: David Torremocha Mesto Structure engineer: Infotaller de Estructuras S.L.
- Draftsman: José Luis Paredes Conde
- Bill Of Quantities: Manuel Sevilla Seoane, Yolanda García Portillo
- Systems Engineer: David Torremocha Mesto
- Structure Engineer: Infotaller de Estructuras S.L
- Works Supervision Team: Pablo Notari Oviedo (Architect), Steffen Ringler, David Torremocha Mesto (Collaborators), Manuel Sevilla Seoane (Assistant)
© Eduardo Sánchez
From the architect. This project was born as result of the restricted competition launched in April, 2002 by AIRBUS Spain S.L. The works began in February 2003, ending in July of 2004.
© Eduardo Sánchez
The building is located at the entrance of the Airbus factory in Getafe´s municipality, forming its access door.
Ground Floor
The spatial solution of three blocks supported on a stone podium linked to the topography, is the fundamental element of its expression, creating a central courtyard where the main entrance is located.
© Eduardo Sánchez
This access space is designed as a large Atrium surrounded by the glazed wings of the offices, and covered by a large canopy. The wings are connected with the rear longitudinal block by two vertical circulation cores, where also the spaces of relationship and service of each plant are located. In the rear block the closed offices are located, and the open offices are on the glazed wings.
© Eduardo Sánchez
Type Floor
© Eduardo Sánchez
In the access floor two patios as guiding spaces of the building are arranged, dynamic spaces both by the horizontal circulations created around them, as by the different intensities and reflections of natural light that they produce.
© Eduardo Sánchez
This Project, highly energy efficient and sustainable, expresses the commitment of AIRBUS with the environment.
© Eduardo Sánchez
The North longitudinal block has a metal panels façade, similar to the industrial buildings of the factory. But to the South it has a double façade composed by a skin of glass, and a second façade of horizontal metal louvers for light sun control.
Detail
Detail
The lateral wings also have double façades, in this case double glass façades with an intermediate space. These double façades are intended to prevent the greenhouse effect, which is difficult to control using louvers in the East and West orientations. This double façade forces up the hot air circulation in the inside, eliminating it quickly in summer, and allowing its reuse in winter by injecting the hot air in the air conditioning system.
© Eduardo Sánchez
The energy-efficient system is completed with a ventilated double cover formed by metal louvers that meet three functions: the protection of the air conditioning machinery, the solar light passive control optimizing the circulation of air, and the support of the photovoltaic panels.
© Eduardo Sánchez
Futuristic digital billboard to be erected in Hollywood
A design for “the most Instagrammable billboard in the world” by a Los Angeles team has beaten schemes by Zaha Hadid Architects and Gensler in a competition to create an advertising structure for Sunset Boulevard. Read more
@signordal
How to Avoid Online Shopping Pitfalls this Holiday Season
Shopping online is a convenient way to buy holiday gifts and other things. Get the best prices and protect against online shopping problems and fraud with these tips.
The Secret Formula for Attracting Customers
Businesses that are thriving and growing have a steady flow of repeat and referred customers. Learn their secret for attracting clients here.